Armstrong Court — 26-property pitched roof refurbishment
Complete pitched roof refurbishment across 26 residential properties at Armstrong Court, Southampton. Southern Projects delivered strip-off and replacement of existing roof tiles, membrane and slats with new Russell Double Roman tiles and Permavent breather membrane system.
Client
Trident Maintenance Services Ltd
Year
2025
Sector
Residential
Key highlights
- Complete pitched roof refurbishment across 26 residential properties
- Russell Double Roman tiles with Permavent breather membrane system
- Wind speed monitoring protocols with work stopped above 28mph
- Coordinated asbestos surveys and licensed removal procedures
- Phased delivery to minimise disruption to occupied residential blocks
Properties completed
26 residential units
Roof pitch
30° engineered design
Wind speed limit
28mph safety protocol
Truss spacing
600mm maximum centres
About the project
Project overview
Armstrong Court comprises three residential blocks (1-8, 9-18, and 19-26) in Southampton SO16 8GG, requiring comprehensive pitched roof refurbishment to address deteriorating roof coverings and underlying membrane systems. The 26-property development presented typical challenges of occupied residential buildings, requiring careful coordination with tenants and robust exclusion zones to maintain safety throughout the works.
The scope encompassed complete strip-off and replacement of existing roof tiles, membrane and slats across all three blocks. Working constraints included strict wind speed monitoring with work aborted above 28mph, limited working hours from 08:00-16:00 Monday to Friday to minimise disruption to residents, and potential asbestos concerns requiring pre-commencement surveys and licensed removal where detected.
The technical specification centred on Russell Double Roman Tile in Peat colour Brown with 75mm headlap, installed over Premium Gold Treated Batten (50mm x 25mm) and Permavent Graphite Breather Membrane. The roof structure incorporated TR26 grade timbers with trusses spaced at maximum 600mm centres, designed for 30° pitch and wind loads up to 827 N/m². TIL-R Universal Dry Fix Ridge systems provided weathertight ridge detailing without traditional mortar bedding.
Delivery was phased by block to manage scaffold requirements and minimise simultaneous disruption. Spurway Scaffolding provided temporary roof cover and material hoisting capability, with mandatory 7-day inspections throughout the extended programme. Materials were lifted via scaffold hoist systems, with waste removal coordinated through designated skip locations to avoid disruption to adjacent properties and vehicle access.
The works incorporated robust safety protocols including competency verification for all operatives working at height, continuous wind speed monitoring using anemometers, and coordinated asbestos management procedures. Refined Waste Management handled debris removal including half roof clearance for Block 9-18 and gable end demolition materials, ensuring efficient site logistics throughout the multi-phase programme.
Completed refurbishment delivered renewed weather-tight roof coverings across all 26 properties. The Russell tile specification, Permavent breather membrane, treated battens and dry-fix ridge detailing provide a durable pitched roof system suited to Southampton's coastal exposure conditions, while reducing reliance on traditional mortar bedding at ridge level.
The Challenge
Comprehensive roof refurbishment across 26 occupied residential properties requiring careful coordination of asbestos surveys, weather-dependent working conditions with wind speed monitoring above 28mph, and phased delivery to minimise tenant disruption while maintaining structural weather protection throughout the multi-block programme.
Our Approach
Phased strip-off and replacement programme using Russell Double Roman tiles over Permavent breather membrane system, with scaffold-mounted material hoists and coordinated waste management. Implementation of robust safety protocols including continuous wind monitoring, competency-verified operatives, and pre-emptive asbestos surveys with licensed removal capabilities where required.
Results & Outcomes
Weather-tight roof coverings were renewed across all three residential blocks, with Russell Double Roman tiles, Permavent breather membrane, treated battens and dry-fix ridge detailing providing a more durable pitched roof system for the estate.
Timeline
01
Pre-commencement
Asbestos surveys, scaffold erection and safety briefings
1 week
02
Block 1-8 refurbishment
Strip-off and tile replacement depending on chimney condition
1-2 weeks
03
Block 9-18 refurbishment
Complete roof covering replacement with waste clearance
1-2 weeks
04
Block 19-26 completion
Final phase delivery with scaffold removal
1-2 weeks